Weingrill Screw Jacks require minimum maintenance.
- Keep Jack lubrified.
- Screw Jack should be revised every 500 hours of operation to check components wear. Replace lubricant and parts as required.
- This control shall be more frequent in case of high duty applications.
- Routinely inspect Work Screw and eventually remove dirt deposits on the thread.
- When the backlash between Work Screw and Drive Sleeve exceed ¼ of the pitch replace complete Work Screw, Worm and Screw Gear set.
Spare parts or complete replacements units should be kept in stock to avoid possible extended maintenance shut down.